Demolition and Grading

The demolition has been completed.  Next step R & R (remove and re-compact).  This process entails of removing 5ft of dirt and filling it back up in levels with a soil engineer inspecting each level.  This process had to be done in 2 phases to allow room to store the dirt.   If you look at the pictures it looks like the lot is flat but there is a 3ft difference between sides.

 

Remove and Recompact

Graded Lot